s

information@ngcp.com

(02) 8863 7231

Operations and Maintenance

NGCP's task is to ensure that the country's transmission assets are in optimal condition to convey safe, quality, and reliable electricity.

System Operations

Reliability of power is the company's utmost priority so it closely monitors the grid and immediately responds to any system disturbance.

Planning and Engineering

Building new transmission lines and expanding substation capacity are equally important as increasing power supply.

21K+

Available Generating Capacity

16K+

System Peak Demand

4K+

Operating Margin

Our Services

ONGOING PROJECTS

NGCP implements various transmission and substation projects in accordance with its 10-year Transmission Development Plan. Each project contributes to the over-all reliability and security of the grid.

Luzon

Luzon is the largest and most populous island group in the Philippines. It includes the nation's capital, Manila, and other major cities like Quezon City and Baguio.

Visayas

The Visayas is a central group of islands in the Philippines, located between Luzon to the north and Mindanao to the south.

Mindanao

Mindanao is the southernmost island group in the Philippines and is known for its diverse culture, rich natural resources, and vibrant indigenous communities.

Work

Advocacies

By championing these advocacies, NGCP strives to create a positive and lasting impact on society, the environment, and the future of energy in the Philippines.

Operations

Power Transmission

NGCP has the crucial role of linking power generators and distribution utilities to deliver electricity where it is most needed. Its network of interconnected transmission towers and substations serves as the highway where electricity travels from various energy sources to the smaller thoroughfares of distribution utilities and electric cooperatives until it reaches the households.

Operation and Maintenance
2024

NGCP's task is to ensure that the country's transmission assets are in optimal condition to convey safe, quality, and reliable electricity. NGCP does this through regular inspection and repair of lines and substations, clearing of Right-of-Way obstructions, and timely restoration during and after natural disasters.

System Operations
2024

Reliability of power is the company's utmost priority so it closely monitors the grid and immediately responds to any system disturbance. NGCP acts as System Operator that balances the supply and demand of power to maintain the quality of electricity that flows through the grid.

Planning and Engineering
2024

Building new transmission lines and expanding substation capacity are equally important as increasing power supply. NGCP ensures that the grid is prepared whenever new plants come online and when the demand for power in a certain area increases by anticipating these scenarios and constructing new facilities. All of NGCP's projects are well laid out in its 10-year Transmission Development Plan.